MACRO MODELS OF UK CONSTRUCTION CONTRACT PRICES

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Forecasting UK stock prices

The Vector Autoregressive (VAR) model, the Error Correction Model (ECM), and the Kalman Filter Model (KFM) are used to forecast UK stock prices. The forecasting performance of the three models is compared using out of sample forecasting. The results show that the forecasting performance of the ECM is better than that of the VAR and the KFM, and that the VAR performs a forecasting better than th...

متن کامل

Contract Parameters’ Impacts on Coal Prices

The use of long-term contracts in the procurement of coal for electricity generation is common. The data that is observed from contracts and their transactions are from different levels of the pricing process. Contracts contain the parameters by which all future deliveries are structured, specifying the length of the agreement and acceptable coal attributes. Based on these parameters, a price i...

متن کامل

MACRO ANALYSIS OF CONSTRUCTION PROCUREMENT TRENDS Shiyami..

The procurement system is a key means through which the client creates preconditions for successful achievement of project specific objectives. Various factors affect the use and development of procurement systems in any construction industry. Thus, it is interesting to discover different systems being used in different instances. This paper present the results of a Panel Data Analysis carried ...

متن کامل

How do UK companies set prices?

5 1 Why is price setting important? 7

متن کامل

How do individual UK consumer prices behave ?

This paper examines the behaviour of individual consumer prices in the United Kingdom, and uncovers a number of stylised facts about pricing behaviour. First, on average 19% of prices change each month, although this falls to 15% if sales are excluded. Second, the probability of price changes is not constant over time. Third, goods prices change more frequently than services prices. Fourth, the...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Civil Engineering Systems

سال: 1993

ISSN: 0263-0257

DOI: 10.1080/02630259308970129