MAC Access Delay Analysis of EDCA Mechanism of Wireless LANs

نویسندگان

چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Performance analysis of IEEE 802.11e EDCA in wireless LANs

In this paper, we propose an analytical model for the performance evaluation of IEEE 802.11e enhanced distributed channel access (EDCA). Different from most previous analytical studies based on the saturation assumption, we extend the analytical model to non-saturation conditions. An empty state is introduced into the Markov chain to represent the status of transmission queue being empty. This ...

متن کامل

Packet delay analysis of the advanced infrared (AIr) CSMA/CA MAC protocol in optical wireless LANs

During the past few years the wireless technology market has experienced a tremendous growth. Users today expect to be able to communicate and access data anytime, anywhere, using almost any portable device. Infrared Data Association (IrDA) addressed the requirement for indoor multipoint wireless connectivity with the development of the advanced infrared (AIr) protocol stack utilizing the infra...

متن کامل

Performance analysis of IEEE 802.11 MAC protocols in wireless LANs

IEEE 802.11 MAC protocol is the de facto standard for wireless LANs, and has also been implemented in many network simulation packages for wireless multi-hop ad hoc networks. However, it is well known that, as the number of active stations increases, the performance of IEEE 802.11 MAC in terms of delay and throughput degrades dramatically, especially when each station’s load approaches to its s...

متن کامل

Decentralized Control Mechanism Suppressing Delay Fluctuation in Wireless LANs

Real-time applications such as phone, videoconference, multimedia streaming, are typical applications which require relatively small delay and small delay fluctuation. To meet the QoS requirements of these applications, network infrastructures should have the ability to accommodate real-time traffic. Recently, IEEE802.11 wireless LANs, fundamentally based on CSMA/CA, have been widely used as pa...

متن کامل

Reliable multicast MAC protocol for wireless LANs

Reliable multicast in wireless applications is gaining importance with the development in technology. Applications like multicast file transfer, distributed computing, chat and whiteboard applications need reliability. However, due to mobility and wireless channel characteristics, obtaining reliability in data transfer is a difficult and challenging task. IEEE 802.11 does not support reliable m...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Software

سال: 2008

ISSN: 1000-9825

DOI: 10.3724/sp.j.1001.2008.02127