Lot-to-Lot Inconsistency of Anticardiolipin Reagents
نویسندگان
چکیده
منابع مشابه
How to Use MRP in Continuous Production Industries When Order Type is Lot for Lot
The Materials Requirements Planning (MRP) method that is applied in production planning and management has some weaknesses. One of its weaknesses is that the time in MRP method is discrete, and is considered as time period. Hence we are not able to order our requirements at irregular time moments or periods. In this paper, a new form of MRP is introduced that is named Continuous Materials Requi...
متن کاملFailure of current laboratory protocols to detect lot-to-lot reagent differences: findings and possible solutions.
BACKGROUND Maintaining consistency of results over time is a challenge in laboratory medicine. Lot-to-lot reagent changes are a major threat to consistency of results. METHODS For the period October 2007 through July 2012, we reviewed lot validation data for each new lot of insulin-like growth factor 1 (IGF-1) reagents (Siemens Healthcare Diagnostics) at Mayo Clinic, Rochester, MN, and the Un...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Clinical Chemistry
سال: 2002
ISSN: 0009-9147,1530-8561
DOI: 10.1093/clinchem/48.9.1625