Lot Splitting in Stochastic Flow Shop and Job Shop Environments
نویسندگان
چکیده
منابع مشابه
Customer Order Scheduling with Job-Based Processing and Lot Streaming In A Two-Machine Flow Shop
This paper considers a customer order scheduling (COS) problem in which each customer requests a variety of products processed in a two-machine flow shop. A sequence-independent attached setup for each machine is needed before processing each product lot. We assume that customer orders are satisfied by the job-based processing approach in which the same products from different customer orders f...
متن کاملFuzzy job shop scheduling with lot-sizing
This paper deals with a problem of determining lot-sizes of jobs in a real-world job shop-scheduling in the presence of uncertainty. The main issue discussed in this paper is lot-sizing of jobs. A fuzzy rule-based system is developed which determines the size of lots using the following premise variables: size of the job, the static slack of the job, workload on the shop floor, and the priority...
متن کاملLot Streaming in Hybrid Flow Shop Scheduling
Production planning and scheduling play significant roles in manufacturing system operations and different techniques have been used to enhance their performance. Lot streaming has been studied for decades and is shown to accelerate production flow. This research deals with lot streaming in hybrid flow shops. Multiple products are processed in a multi-stage hybrid flow shop with non-identical m...
متن کاملMathematical Models of Flow Shop and Job Shop Scheduling Problems
In this paper, mathematical models for permutation flow shop scheduling and job shop scheduling problems are proposed. The first problem is based on a mixed integer programming model. As the problem is NP-complete, this model can only be used for smaller instances where an optimal solution can be computed. For large instances, another model is proposed which is suitable for solving the problem ...
متن کاملJob-shop scheduling in a body shop
We study a generalized job-shop problem called the body shop scheduling problem (BSSP). This problem arises from the industrial application of welding in a car body production line, where possible collisions between industrial robots have to be taken into account. BSSP corresponds to a job-shop problem where the operations of a job have to follow alternating routes on the machines, certain oper...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Decision Sciences
سال: 1996
ISSN: 0011-7315,1540-5915
DOI: 10.1111/j.1540-5915.1996.tb01716.x