Lot sizing and scheduling — Survey and extensions
نویسندگان
چکیده
منابع مشابه
Simultaneous Lot Sizing and Scheduling in a Flexible Flow Line
This paper breaks new ground by modelling lot sizing and scheduling in a flexible flow line (FFL) simultaneously instead of separately. This problem, called the ‘General Lot sizing and Scheduling Problem in a Flexible Flow Line’ (GLSP-FFL), optimizes the lot sizing and scheduling of multiple products at multiple stages, each stage having multiple machines in parallel. The objective is to satisf...
متن کاملEconomic Lot Sizing and Scheduling in Distributed Permutation Flow Shops
This paper addresses a new mixed integer nonlinear and linear mathematical programming economic lot sizing and scheduling problem in distributed permutation flow shop problem with number of identical factories and machines. Different products must be distributed between the factories and then assignment of products to factories and sequencing of the products assigned to each factory has to be d...
متن کاملA Survey of Lot-sizing and Scheduling Models
This paper surveys Lot-Sizing and Scheduling Models emphasising single-stage cases. The objective here is to present different aspects of such models in the operational research area and notes the most common modern methods to solve them. Metaheuristic methods feature heavily in the research literature. In this work the reader will find many references, though it must be noted that the speed wi...
متن کاملScheduling with Batching and Lot-sizing
Jobs can be batched if they share the same setup times on a machine in many practical situations. Another reason for batching arises when a machine can process several jobs at the same time. On the other hand, splitting a job or lot which consists of many identical items often increases customer service and decreases throughput time. Especially in CIM (Computer Integrated Manufacturing) these d...
متن کاملA Stochastic Lot-Sizing and Scheduling Model
Companies are trying to improve their ability to deliver and to reduce their production costs simultaneously. Nevertheless ongoing orders of customers are causing difficulties to deliver because of bottlenecks in the production. Furthermore constantly incoming customer orders effect that every actual optimal production plan with its already realized and planned guidelines has induced states tha...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: European Journal of Operational Research
سال: 1997
ISSN: 0377-2217
DOI: 10.1016/s0377-2217(97)00030-1