Longitudinal Bunch Size Measurements with an RF Deflector at J-PARC LINAC

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Power Upgrade of J-parc Linac

The linac power upgrade program is now in progress, after a successful recovery from the earthquake disaster. The power upgrade includes an ion source, a RFQ, and a 400 MeV annular-ring coupled structure (ACS) linac. We started a full-scale development of a cesium-seeded RFdriven negative hydrogen ion source. The ion source extracted a beam current of more than 60 mA with a duty factor of 2.5 %...

متن کامل

Operating Experience of the J-PARC Linac

The beam commissioning of the J-PARC linac started in November 2006 and 181 MeV acceleration was successfully achieved in January 2007. The linac has delivered beams to the 3 GeV Rapid Cycling Synchrotron for its commissioning, and then, the subsequent Main Ring Synchrotron and the neutron target commissioning. The linac uses a Cs-free LaB6-driven ion source and 20 units of 324 MHz klystrons. A...

متن کامل

Single Bunch Longitudinal Measurements of the Cornell Electron- Positron Storage Ring with the Superconducting RF Cavities

As part of the Phase III luminosity upgrade, the Cornell Electron-Positron Storage Ring (CESR) RF system has been upgraded from normal conducting (NRF) to superconducting (SRF) cavaties. The new superconducting cavities change the overall impedance of CESR and thus change the longitudinal bunch distribution. Measurements of the single bunch longitudinal distribution have been made using a strea...

متن کامل

Cold-model Tests of an Annular Coupled Structure for Upgrade of a J-parc Linac

An Annular Coupled Structure (ACS) has been developed for upgrade of a J-PARC (Japan Proton Accelerator Research Complex) linac from 180 MeV to 400 MeV. Although install area is prepared for the ACS cavities at an initial construction, it will be used as a beam-transport line temporarily. Aluminum and copper models were fabricated for RF properties confirmation based on an initial design, and f...

متن کامل

High-energy hadron physics at J-PARC

The J-PARC facility is near completion and experiments will start in 2009 on nuclear and particle physics projects. In this article, the J-PARC facility is introduced, and possible projects are discussed in high-energy hadron physics by using the primary proton beam of 30−50 GeV. There are proposed experiments on charm-production and Drell-Yan processes as well as single spin asymmetries for in...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Physics: Conference Series

سال: 2018

ISSN: 1742-6588,1742-6596

DOI: 10.1088/1742-6596/1067/5/052008