Long-Term Load Forecasting of Southern Governorates of Jordan Distribution Electric System
نویسندگان
چکیده
منابع مشابه
Different Methods of Long-Term Electric Load Demand Forecasting a Comprehensive Review
Long-term demand forecasting presents the first step in planning and developing future generation, transmission and distribution facilities. One of the primary tasks of an electric utility accurately predicts load demand requirements at all times, especially for long-term. Based on the outcome of such forecasts, utilities coordinate their resources to meet the forecasted demand using a least-co...
متن کاملFuzzy Load Forecasting of Electric Power System
In order to efficiently improve the prediction accuracy, two load forecasting model based on fuzzy theory are presented, which are fuzzy clustering model and improved fuzzy regression analysis model .The method of fuzzy clustering is used to divide the area by the similar feature of load increasing. The new division is promising to improve the result of evident degree of clustering index to pow...
متن کاملLong-term Electric Peak Load Forecasting for Power System Planning: a Comparative Study
GDP The gross domestic product POP The population GDP CAP The gross domestic product per capita LOSS The system power losses (MW) EP Electricity consumption (Multiplication of electricity consumption by population) LF Load factor R/S Cost of one kWh (milliamps/kWh) (cost of Energy).
متن کاملFuzzy Ideology based Long Term Load Forecasting
Fuzzy Load forecasting plays a paramount role in the operation and management of power systems. Accurate estimation of future power demands for various lead times facilitates the task of generating power reliably and economically. The forecasting of future loads for a relatively large lead time (months to few years) is studied here (long term load forecasting). Among the various techniques used...
متن کاملDifferent Methods of Long-Term Electric Load Demand Forecasting; A Comprehensive Review
Long-term demand forecasting presents the first step in planning and developing future generation, transmission and distribution facilities. One of the primary tasks of an electric utility accurately predicts load demand requirements at all times, especially for long-term. Based on the outcome of such forecasts, utilities coordinate their resources to meet the forecasted demand using a least-co...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Energy and Power Engineering
سال: 2015
ISSN: 1949-243X,1947-3818
DOI: 10.4236/epe.2015.75023