Long lead-time radar rainfall nowcasting method incorporating atmospheric conditions using long short-term memory networks

نویسندگان

چکیده

High-resolution radar rainfall data have great potential for predictions up to 6 h ahead (nowcasting); however, conventional extrapolation approaches based on in-built physical assumptions yield poor performance at longer lead times (3–6 h), which limits their operational utility. Moreover, atmospheric factors in estimate errors are often ignored. This study proposed a nowcasting method that attempts achieve accurate of using long short-term memory (LSTM) networks. Atmospheric conditions were considered reduce errors. To build models LSTM networks (LSTM-RN), approximately 11 years radar, gauge rainfall, and from the UK obtained. Compared with built optical flow (OF-RN) random forest (RF-RN), LSTM-RN had lowest root-mean-square (RMSE), highest correlation coefficients (COR), mean bias closest 0. Furthermore, showed growing advantage times, RMSE decreasing by 17.99% 7.17% compared OF-RN RF-RN, respectively. The results also revealed strong relationship between weather conditions. provides an effective solution enhances forecast value supports practical

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Stacked Long Short-term Memory Neural Networks

In this paper, we describe a novel approach to generate conference call-for-papers using Natural Language Processing and Long Short-Term Memory network. The approach has been successfully evaluated on a publicly available dataset.

متن کامل

Dialog state tracking using long short-term memory neural networks

Neural network based approaches have recently shown stateof-art performance in the Dialog State Tracking Challenge (DSTC). In DSTC, a tracker is used to assign a label to the state at each moment in an input sequence of a dialog. Specifically, deep neural networks (DNNs) and simple recurrent neural networks (RNNs) have significantly improved the performance of the dialog state tracking. In this...

متن کامل

Transmembrane Protein Prediction using Long Short-Term Memory Networks

Transmembrane Protein Prediction is a problem with many uses as experimental determination of protein structures is still expensive and for different purposes it can be useful to know the structure. Here I introduce a small long short-term memory network based model which gives a precision of 67 ± 3 and a recall of 71± 3. The model manages, when compared to TMSEG [3], slightly worse but is stil...

متن کامل

Dialogue State Tracking using Long Short Term Memory Neural Networks

We propose a dialogue state tracker based on long short term memory (LSTM) neural networks. LSTM is an extension of a recurrent neural network (RNN), which can better consider distant dependencies in sequential input. We construct a LSTM network that receives utterances of dialogue participants as input, and outputs the dialogue state of the current utterance. The input utterances are separated...

متن کامل

Long Short-term Memory

Model compression is significant for the wide adoption of Recurrent Neural Networks (RNNs) in both user devices possessing limited resources and business clusters requiring quick responses to large-scale service requests. This work aims to learn structurally-sparse Long Short-Term Memory (LSTM) by reducing the sizes of basic structures within LSTM units, including input updates, gates, hidden s...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Frontiers in Environmental Science

سال: 2023

ISSN: ['2296-665X']

DOI: https://doi.org/10.3389/fenvs.2022.1054235