Long lead time flood warnings: reality or fantasy?
نویسندگان
چکیده
منابع مشابه
Love in nursing: reality or fantasy?
Background & Aim: From the beginning of theorizing in nursing, relationship was proposed as an essential element in care. Love is also an essential element in a relationship. Although the place of love in nursing has not been explained systematically, the works of theorists such as Watson and others` works are significant. Therefore, this study is presented with the aim of explaining love in th...
متن کاملLinkage disequilibrium mapping of complex disease: fantasy or reality?
In the past year, data about the level and nature of linkage disequilibrium between alleles of tightly linked SNPs have started to become available. Furthermore, increasing evidence of allelic heterogeneity at the loci predisposing to complex disease has been observed, which has lead to initial attempts to develop methods of linkage disequilibrium detection allowing for this difficulty. It has ...
متن کاملUric Acid for Acute Stroke: Fantasy or Reality?
lenges whether or not SUA is indeed effective for stroke. A consensus recommendation has been made that the preclinical neuroprotectant should show efficacy in at least 2 species and in 2 laboratories using different models [10] . It is therefore imperative to explore the attendant concerns. First of all, experimental studies that assess SUA in animal models of ischemic stroke should preferably...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Meteorological Applications
سال: 2009
ISSN: 1350-4827,1469-8080
DOI: 10.1002/met.123