Logistics Planning Within the Last Planner System for Highway Construction Projects

نویسندگان

چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Schedule Multiple Highway Construction Projects

The scheduling of numerous construction projects considering several factors is an important challenge faced by construction companies, particularly road builders. Road builders need to make decision to identify the best possible schedule to complete multiple constructions while considering multiple factor such as maximizing profit, reducing risk, and resource constraints among many other factors.

متن کامل

Exploring the Recurrent Problems in the Last Planner Implementation on Construction Projects

Traditionally, production control on construction sites has been a challenging area, where the ad-hoc production control methods foster uncertainty one of the biggest enemies of efficiency and smooth production flow. The Last Planner System has been one of the most popular lean construction tools that offers a solution to tackle the problems of production management on construction sites. Since...

متن کامل

Green Performance Contracting Strategy for Highway Construction Projects

With the growing awareness of sustainability and global climate change, state highway agencies are taking essential steps to reduce carbon emissions from highway infrastructure on a life cycle basis. While much is known regarding climate change mitigation and adaption strategies during highway operation, very little is understood about how climate change issues should be integrated into highway...

متن کامل

DEVELOPING THE LSM VPR SCHEDULING METHOD FOR SCHEDULING HIGHWAY CONSTRUCTION PROJECTS BASED ON EFFECTIVE FACTORS ON EMBANKMENT ACTIVITY PRODUCTIVITY

Highway construction projects are one of the most important construction projects in the world. Therefore predicting the time of these kinds of projects is important. Basically highway projects are including few activities which are repeating along the horizontal direction. One of the best methods for scheduling these types of projects is linear scheduling method. The repetitive nature of the h...

متن کامل

The Last Planner System in China's construction industry — A SWOT analysis on implementation

The Last Planner SystemTM (LPS) is well-documented in the literature, and has sometimes been used to represent lean construction or lean project management. LPS aims to achieve reliable workflow by encouraging foremen to have a sense of ownership of the project programme and to build-in their commitment into it. This study reports on the perceptions of Chinese building professionals of the appl...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Annual Conference of the International Group for Lean Construction

سال: 2023

ISSN: ['2789-0015', '2309-0979']

DOI: https://doi.org/10.24928/2023/0191