Literature Review and Identification of Prominent Cost Overrun Causing Factors in Highway Projects
نویسندگان
چکیده
منابع مشابه
Analysis of Cost Overrun in Highway Construction Projects Using Multiple Regression and Artificial Neural Networks
Cost overruns are more common in infrastructure projects especially, more common in road construction activities. There existed a need to develop a probabilistic cost overrun analysis model in construction projects as a decision support tool for contractors before the bidding stage. The objective of this study is to identify the critical factors affecting cost overrun and obtain statistical mod...
متن کاملIdentification of Factors Causing Time and Cost Overruns in Offshore Petroleum Modification Projects
Many of the production facilities and technologies operated on the Norwegian Continental Shelf are getting older and need to be modified to maintain the production performance at the desirable level. Each modification project is unique, and therefore needs to be evaluated and verified with consideration to all specifications. However, the oil and gas industry experience shows that the execution...
متن کاملFactors Causing Project Cost Overrun in the Telecommunications Industry in Oman
Several studies have been carried out to investigate the causes of project cost overrun in different industries worldwide. This paper reports on the results of a study investigating the factors causing project cost overrun in Oman. Data required for this study were collected from 44 project engineers and managers of client and contracting companies involved in telecommunications projects. Accor...
متن کاملnorms and ideology in translation of children literature in persian context
اهداف عمده ی این مطالعه دو دسته هستند:1) تعیین هنجار های اجتماعی فرهنگی مورد استفاده در ترجمه ی کتاب کودک برای کودکان ایرانی 2) بررسی مفهوم کودک در ایران و ائدئولوژی این جامعه در رابطه با کودک که مترجم را مجبور به بازسازی کتابهای داستان برای کودکان ایرانی میکند. به این منظور, ابتدا ,مجموعه ای از 30 کتاب داستان و ترجمه های فارسی انها بر اساس مدلlambert and van gorp(2006)مقایسه شد و سپس استراتژیه...
15 صفحه اولQualitative analysis of Time delay and Cost overrun in Multiple Design and Build Projects
Nowadays projects are more complicated involving huge contract values, participants from multi-discipline, more specialized works, tighter schedule, stringent quality standards, etc. Ultimately, cost and time are the two key parameters that plays significant role in a project success. The study focuses on multiple Design and Build (D&B) project which has complicated risk and is governed by fixe...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal for Research in Applied Science and Engineering Technology
سال: 2019
ISSN: 2321-9653
DOI: 10.22214/ijraset.2019.4226