Life Cycle Assessment of Steel Produced in an Italian Integrated Steel Mill

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Life cycle assessment of steel production from iron scrap: a case study at a steel plant

Background and Objective: The steel industry is the world's largest consumer of energy. A large amount of iron waste is produced annually, which its use in the steel industry can be economic. The purpose of this study was to investigate the environmental impacts of the steelmaking from iron scrap as a raw material using a life cycle assessment (LCA) method. Materials and Methods: Simapro softw...

متن کامل

Energy-Based Prediction of Low-Cycle Fatigue Life of CK45 Steel and SS316 Stainless Steel

In this paper, low cycle fatigue life of CK45 steel and SS316 stainless steel under strain-controlled loading are experimentally investigated. In addition, the impact of mean strain and strain amplitude on the fatigue life and cyclic behavior of the materials are studied. Furthermore, it is attempted to predict fatigue life using energy and SWT damage parameters. The experimental results demons...

متن کامل

Pulmonary fibrosis in a steel mill worker.

We report a case of pulmonary fibrosis in a 32-year-old man, who had worked at a steel mill and who died of respiratory failure due to interstitial fibrosis despite vigorous treatment. He showed SLE-associated symptoms, such as pleural effusion, malar rashes, discoid rashes, arthritis, leukopenia, and positive antinuclear antibody and anti-histone antibody. However, he did not present anti-DNA ...

متن کامل

The Steel Mill Slab Design Problem Revisited

Recently, Gargani and Refalo (G&R) presented an elegant model for the Steel Mill Slab Design Problem (Problem 38 in the CSP LIB). Contrary to earlier approaches, their model does not use 0/1 variables but exploits the traditional expressiveness of constraint programming. G&R indicated that static symmetry-breaking constraints proposed earlier are not effective on this model, as these interact w...

متن کامل

Optimal and heuristic lead-time quotation for an integrated steel mill with a minimum batch size

Follow this and additional works at: http://engagedscholarship.csuohio.edu/bus_facpub Part of the Business Administration, Management, and Operations Commons Publisher's Statement NOTICE: this is the author’s version of a work that was accepted for publication in European Journal of Operational Research. Changes resulting from the publishing process, such as peer review, editing, corrections, s...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Sustainability

سال: 2016

ISSN: 2071-1050

DOI: 10.3390/su8080719