Leucaena production in the Fitzroy River catchment, central Queensland, Australia
نویسندگان
چکیده
منابع مشابه
Fine-suspended sediment and water budgets for a large, seasonally dry tropical catchment: Burdekin River catchment, Queensland, Australia
The Burdekin River catchment ( 130,400 km) is a seasonally dry tropical catchment located in north-east Queensland, Australia. It is the single largest source of suspended sediment to the Great Barrier Reef (GBR). Fine sediments are a threat to ecosystems on the GBR where they contribute to elevated turbidity (reduced light), sedimentation stress, and potential impacts from the associated nutri...
متن کاملA New Method for Estimating Flow Duration Curves : an Application to the Burdekin River Catchment, North Queensland, Australia
This paper presents a new method of representing flow duration curves (FDC) using a logarithmic transformation. The FDC has been defined using two parameters – the ‘cease to flow’ point, and the slope of the FDC. This method for defining the FDC has been applied to 23 sub-catchments of the Burdekin River in North Queensland, Australia. The two parameters defining the FDC have been related to th...
متن کاملApplication of artificial neural networks in flow discharge prediction for the Fitzroy River, Australia
JOORABCHI, A. ZHANG, H. and BLUMENSTEIN, M, 2007. Application of artificial neural networks in flow discharge prediction for the Fitzroy River, Australia. Journal of Coastal Research, SI 50 (Proceedings of the 9th International Coastal Symposium), 287 – 291. Gold Coast, Australia, ISSN 0749.0208 Prediction of flow discharge, and in particular floods, in rivers is one of the basic and key inform...
متن کاملTHE UNIVERSITY OF QUEENSLAND Queensland 4072 Australia
This document presents a formal abstract syntax in Z for fragments in the CARE language. Constraints are included which deene the \semantic checks" which deene well-formedness of fragments.
متن کاملTHE UNIVERSITY OF QUEENSLAND Queensland 4072 Australia
We have recently extended the sequential refinement calculus to handle real-time programs. A novel deadline command allows execution time limits to be expressed in a high-level language. The calculus allows refinement steps that separate timing constraints from non-timing requirements. Rules are provided for handling timing constraints, but the refinement of components implementing non-timing r...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Tropical Grasslands-Forrajes Tropicales
سال: 2019
ISSN: 2346-3775
DOI: 10.17138/tgft(7)339-341