The Last Planner System in China's construction industry — A SWOT analysis on implementation
The Last Planner SystemTM (LPS) is well-documented in the literature, and has sometimes been used to represent lean construction or lean project management. LPS aims to achieve reliable workflow by encouraging foremen to have a sense of ownership of the project programme and to build-in their commitment into it. This study reports on the perceptions of Chinese building professionals of the appl...
متن کاملExploring the Recurrent Problems in the Last Planner Implementation on Construction Projects
Traditionally, production control on construction sites has been a challenging area, where the ad-hoc production control methods foster uncertainty one of the biggest enemies of efficiency and smooth production flow. The Last Planner System has been one of the most popular lean construction tools that offers a solution to tackle the problems of production management on construction sites. Since...
متن کاملA Context-Driven Model for the Flat Roofs Construction Process through Sensing Systems, Internet-of-Things and Last Planner System
The main causes of building defects are errors in the design and the construction phases. These causes related to construction are mainly due to the general lack of control of construction work and represent approximately 75% of the anomalies. In particular, one of the main causes of such anomalies, which end in building defects, is the lack of control over the physical variables of the work en...
متن کاملThe Combination of Last Planner System and Location-Based Management System
Research Question: The Last Planner System (LPS) and Location-Based Management System (LBMS) both aim to achieve the lean goals of decreasing waste, increasing productivity and decreasing variability. Q1: How to best link these two systems together to achieve better project performance? Q2: can the LBMS control mechanisms be integrated with LPS? Q3: Can phase pull scheduling be integrated with ...
متن کاملEffector-Based Operator Construction: An Alternative Planner Knowledge Representation for Reducing Planner Maintenance Effort
Researchers attempting to deploy complex planners in practical applications have met with the high cost of maintaining and debugging a planner’s knowledge base. There has been some success in using knowledge acquisition tools and machine learning techniques to assist in development of operator schemas. However, it is often hard for the domain experts who are the users of the program to do their...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: MATEC Web of Conferences
سال: 2017
ISSN: 2261-236X
DOI: 10.1051/matecconf/201711700032