LABOR RESOURCE LEVELING METHOD FOR REPETITIVE CONSTRUCTION WORK

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Resource Leveling Using Petrinet and Memetic Approach

The problem of scheduling activities dynamic for a project, within the available resources and adhering to precedence relationships is NP hard combinatorial. Traditional approaches and their extensions are limited in application for simultaneous scheduling of resources with leveling. Considering the need for improved modeling and scheduling techniques, this paper proposes the use of Petrinet ba...

متن کامل

Using Hopfield to Solve Resource-Leveling Problem

Although the traditional permute matrix coming along with Hopfield is able to describe many common problems, it seems to have limitation in solving more complicated problem with more constrains, like resource leveling which is actually a NP problem. This paper tries to find a better solution for it by using neural network. In order to give the neural network description of resource leveling pro...

متن کامل

Resource Allocation and Resource Leveling in Heterogeneous SANET Environments

Actual research projects in the field of wireless communication systems focus on distributed, heterogeneous architectures for advanced Sensor-Actor-Networks (SANETs). Each subsystem provides specific capabilities for measuring or manipulating its environment. At the same time, a huge amount of sensor, status and control data has to be transmitted over different network interfaces and communicat...

متن کامل

Resource Leveling in Fuzzy Project Scheduling

In this paper a new method based on fuzzy theory is developed to solve the Project Resource Leveling Problem in fuzzy environment. Resource Leveling Problem attempts to minimize the resource usage fluctuations in project plan. Assuming that the duration of activities and resource requirements are fuzzy, in this method we compute several project characteristics such as earliest times, latest tim...

متن کامل

Resource leveling scheduling by an ant colony-based model

In project scheduling, many problems can arise when resource fluctuations are beyond acceptable limits. To overcome this, mathematical techniques have been developed for leveling resources. However, these produce a hard and inflexible approach in scheduling projects. The authors propose a simple resource leveling approach that can be used in scheduling projects with multi-mode execution activit...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Architecture and Planning (Transactions of AIJ)

سال: 1996

ISSN: 1340-4210,1881-8161

DOI: 10.3130/aija.61.183_1