Kisspeptin and KISS1R: a critical pathway in the reproductive system

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Kisspeptin/KISS1R System in Breast Cancer

Kisspeptins (KP), peptide products of the kisspeptin-1 (KISS1) gene are the endogenous ligands for a G protein-coupled receptor (GPCR) - KP receptor (KISS1R). KISS1R couples to the Gαq/11 signaling pathway. KISS1 is a metastasis suppressor gene and the KP/KISS1R signaling has anti-metastatic and tumor-suppressant effects in numerous human cancers. On the other hand, recent studies indicate that...

متن کامل

Metabolic Impact on the Hypothalamic Kisspeptin-Kiss1r Signaling Pathway

1 Platform Degenerative Diseases, German Primate Center, Leibniz Institute for Primate Research, Göttingen, Germany, 2 Department of Developmental Biology, Faculty of Biology, University of Göttingen, Göttingen, Germany, 3 Department of Zoology, Islamia College University, Peshawar, Pakistan, 4 Laboratory of Reproductive Neuroendocrinology, Department of Animal Sciences, Faculty of Biological S...

متن کامل

The kisspeptin-GnRH pathway in human reproductive health and disease

BACKGROUND The discovery of kisspeptin as key central regulator of GnRH secretion has led to a new level of understanding of the neuroendocrine regulation of human reproduction. The related discovery of the kisspeptin-neurokinin B-dynorphin (KNDy) pathway in the last decade has further strengthened our understanding of the modulation of GnRH secretion by endocrine, metabolic and environmental i...

متن کامل

the relationship between learners critical thinking ability and their performance in the reading sections of the tofel and ielts test

the study reflected in this thesis aims at finding out relationships between critical thinking (ct), and the reading sections of tofel and ielts tests. the study tries to find any relationships between the ct ability of students and their performance on reading tests of tofel and academic ielts. however, no research has ever been conducted to investigate the relationship between ct and the read...

15 صفحه اول

a critical discourse analysis on gender representation in the iranian english books 2, 3 and top notch 2a, 2b a critical discourse analysis perspective

هدف از انجام تحقیق حاضر، مطالعه و بررسی نقش زنان و مردان در دو مجموعه از کتابهای درسی انگلیسی در قالب تحلیل گفتمان انتقادی و همچنین، بررسی و آشکار ساختن اصول ایدوئولوژیکی مربوط به نقش زنان و مردان در این کتابها است. این دو مجموعه کتاب عبارتنداز: کتابهای انگلیسی سال دوم و سوم دبیرستانی ایران و کتابهای تاپ ناچ 2آ و 2ب. برای انجام این منظور، مدل تحلیل گفتمان انتقادی فرکلاف مورد استفاده قرار گرفته ...

15 صفحه اول

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: REPRODUCTION

سال: 2008

ISSN: 1470-1626,1741-7899

DOI: 10.1530/rep-08-0091