Key Strategies to Overcome Cost Overruns Issues in Building Maintenance Management

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Strategies to Overcome Network Congestion in Infrastructure Systems

Networked Infrastructure systems deliver services and/or products from point to point along the network. Demand for the services provided by such systems is typically cyclic, creating inefficiencies in capacity utilization. Congestion pricing provides incentives to shift demand from peak time periods to lower demand periods. This effectively increases the capacity of the system without the need...

متن کامل

Equilibrium Cost Overruns

Cost overruns are endemic in military procurement projects and pervasive in other areas. This paper studies a model in which the apparent cost overruns arise not as systematic expectational errors but as equilibrium phenomena. The possibility of renegotiating payments when cost overruns occur results in firms bidding below their true estimate of expected project costs. This can cause the initia...

متن کامل

Key Issues In Knowledge Management

This is an article about key issues in Knowledge Management (KM). It is one person's view about some of the main issues dividing practitioners about how to pursue KM, comprehend it, and eventually realize its value. I cannot, of course, cover all of the main issues here. In fact, my view of what they are may not be shared by other writers in the field. Nevertheless, I hope to cover enough of th...

متن کامل

Osteoporosis: Key Issues in Management

Osteoporosis is a disease characterized by low bone mass with micro architectural deterioration of bone tissue leading to enhance bone fragility. This increases the susceptibility to fracture. Osteoporosis is a major public health problem. Hip fractures are the most devastating consequence of osteoporosis. Osteoporosis is essentially an asymptomatic disease. Medical evaluation includes complete...

متن کامل

An Overview of Group Key Management Issues in IEEE 802.16e Networks

The computer industry has defined the IEEE 802.16 family of standards that will enable mobile devices to access a broadband network as an alternative to digital subscriber line technology. As the mobile devices join and leave a network, security measures must be taken to ensure the safety of the network against unauthorized usage by encryption and group key management. IEEE 802.16e uses Multica...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Engineering & Technology

سال: 2018

ISSN: 2227-524X

DOI: 10.14419/ijet.v7i2.29.13330