Just-in-time Scheduling with Multiple Competing Agents

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The Preemptive Just-in-time Scheduling Problem in a Flow Shop Scheduling System

Flow shop scheduling problem has a wide application in the manufacturing and has attracted much attention in academic fields. From other point, on time delivery of products and services is a major necessity of companies’ todays; early and tardy delivery times will result additional cost such as holding or penalty costs.  In this paper, just-in-time (JIT) flow shop scheduling problem with preemp...

متن کامل

Just-In-Time Scheduling with Constraint Programming

This paper considers Just-In-Time Job-Shop Scheduling, in which each activity has an earliness and a tardiness cost with respect to a due date. It proposes a constraint programming approach, which includes a novel filtering algorithm and dedicated heuristics. The filtering algorithm uses a machine relaxation to produce a lower bound that can be obtained by solving a Just-In-Time Pert problem. I...

متن کامل

Just- n-Time Scheduling with Constraint Programming

This paper considers Just-In-Time Job-Shop Scheduling, in which each activity has an earliness and a tardiness cost with respect to a due date. It proposes a constraint programming approach, which includes a novel filtering algorithm and dedicated heuristics. The filtering algorithm uses a machine relaxation to produce a lower bound that can be obtained by solving a Just-In-Time Pert problem. I...

متن کامل

A Mathematical Programming Model for Flow Shop Scheduling Problems for Considering Just in Time Production

  In this paper, we consider a flow shop scheduling problem with bypass consideration for minimizing the sum of earliness and tardiness costs. We propose a new mathematical modeling to formulate this problem. There are several constraints which are involved in our modeling such as the due date of jobs, the job ready times, the earliness and the tardiness cost of jobs, and so on. We apply adapte...

متن کامل

Single-Machine Scheduling to Minimize Total Completion Time and Tardiness with Two Competing Agents

We consider a single-machine two-agent problem where the objective is to minimize a weighted combination of the total completion time and the total tardiness of jobs from the first agent given that no tardy jobs are allowed for the second agent. A branch-and-bound algorithm is developed to derive the optimal sequence and two simulated annealing heuristic algorithms are proposed to search for th...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of the Korean Operations Research and Management Science Society

سال: 2012

ISSN: 1225-1119

DOI: 10.7737/jkorms.2012.37.1.019