Joint stochastic short-term production scheduling and fleet management optimization for mining complexes
نویسندگان
چکیده
منابع مشابه
Medium Term Hydroelectric Production Planning - A Multistage Stochastic Optimization Model
Multistage stochastic programming is a key technology for making decisions over time in an uncertain environment. One of the promising areas in which this technology is implementable, is medium term planning of electricity production and trading where decision makers are typically faced with uncertain parameters (such as future demands and market prices) that can be described by stochastic proc...
متن کاملStochastic Short-Term Hydro-Thermal Scheduling Based on Mixed Integer Programming with Volatile Wind Power Generation
This study addresses a stochastic structure for generation companies (GenCoʼs) that participate in hydro-thermal self-scheduling with a wind power plant on short-term scheduling for simultaneous reserve energy and energy market. In stochastic scheduling of HTSS with a wind power plant, in addition to various types of uncertainties such as energy price, spinning /non-spinning reserve prices, unc...
متن کاملDeterministic optimization of short-term scheduling for hydroelectric power generation
This work focuses on the deterministic optimization of short-term scheduling for hydroelectric power generation. The proposed methodology builds on a detailed mathematical programming model by considering the topological, reservoir, and plant constraints, and by representing the hydro production by an accurate function. The formulation results in a non-convex MINLP problem. A deterministic opti...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Optimization and Engineering
سال: 2020
ISSN: 1389-4420,1573-2924
DOI: 10.1007/s11081-020-09495-x