Joint optimal production control/preventive maintenance policy for imperfect process manufacturing cell

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Joint optimal production control/preventive maintenance policy for imperfect process manufacturing cell

Production, maintenance, and quality are often modeled as separate problems, despite the strong link that exists between these primary components of any manufacturing system. This paper deals with an integrated approach for the joint optimization of production-inventory control and preventive maintenance policy for a manufacturing cell comprising an imperfect process where the ‘in-control’ peri...

متن کامل

Optimal Joint Preventive Maintenance and Production Policies*

We study joint preventive maintenance (PM) and production policies for an unreliable production-inventory system in which maintenance/repair times are non-negligible and stochastic. A joint policy decides (a) whether or not to perform PM, and (b) if PM is not performed, then how much to produce. We consider a discrete-time system, formulating the problem as a Markov decision process (MDP) model...

متن کامل

Joint optimal lot sizing and preventive maintenance policy for a production facility subject to condition monitoring

In this paper, we consider the joint optimization of economic manufacturing quantity (EMQ) and preventive maintenance (PM) policy for a production facility subject to deterioration and condition monitoring (CM). Unlike the previous joint models of EMQ and maintenance policy which used traditional maintenance approaches, we propose the proportional hazards model (PHM) to consider CM information ...

متن کامل

Quasi-optimal integrated production, inventory and maintenance policies for a single-vendor single-buyer system with imperfect production process

In this paper we deal with the integrated supply chain management problem in the context of a single vendorsingle buyer system for which the production unit is assumed to randomly shift from an in-control to an out-of-control state. At the end of each production cycle, a corrective or preventive maintenance action is performed, depending on the state of the production unit, and a new setup is c...

متن کامل

Optimal imperfect maintenance strategy for leased equipment

This paper presents a preventive maintenance (PM) policy for leased equipment over a finite lease period L. Maintenance is entrusted to the lessor. The purpose is to determine the PM period T minimizing the expected total cost over the lease period in a context where repairs and PM actions are imperfect and have non-negligible durations. The leased equipment is periodically subjected to imperfe...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Production Economics

سال: 2012

ISSN: 0925-5273

DOI: 10.1016/j.ijpe.2012.01.023