منابع مشابه
JCE Vol 2 Nr 4 interior
Out-of-hospital cardiac arrest (OHCA) occurring as the first manifestation of an acute myocardial infarction is associated with very high mortality rates. As in comatose patients the etiology of cardiac arrest may be unclear, especially in cases without ST-segment elevation on the surface electrocardiogram, the decision to perform or not to perform urgent coronary angiography can have a signifi...
متن کاملJCE Vol 3 Nr 1 interior
This is a case report of a 36-year-old male who was diagnosed with acute inferior and right ventricular myocardial infarction and treated with percutaneous coronary angioplasty with a drug-eluting stent in the right coronary artery. A profile test for thrombophilia was performed for methylene tetrahydrofolate reductase (MTHFR) gene mutation; the test was positive for a heterozygous mutation — C...
متن کاملJCE Vol 3 Nr 2 interior PRINT
Cardiogenic shock remains the leading cause of death in patients hospitalized for acute myocardial infarction, despite many advances encountered in the last years in reperfusion, mechanical, and pharmacological therapies addressed to stabilization of the hemodynamic condition of these critical patients. Such patients require immediate initiation of the most effective therapy, as well as a conti...
متن کاملCleanroom software engineering for zero-defect software - Software Engineering, 1993. Proceedings., 15th International Conference on
Cleanroom software engineering is a theory-based, team-oriented process for developing very high quality software under statistical quality control. Cleanroom combines formal methods of object-based box structure specification and design, functiontheoretic correctness veri/ication, and statistical usage testing for quality certification, to produce sofmare that is zero defects with high probabi...
متن کاملReport of the Inquiry Into The London Ambulance Service ( February 1993 ) International Workshop on Software Specification
1001 What is clear from the Inquiry Team's investigations is that neither the Computer Aided Despatch (CAD) system itself, nor its users, were ready for full implementation on 26 October 1992. The CAD software was not complete, not properly tuned, and not fully tested. The resilience of the hardware under a full load had not been tested. The fall back option to the second file server had certai...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Chemical Education
سال: 1993
ISSN: 0021-9584,1938-1328
DOI: 10.1021/ed070p62