Iterated Greedy methods for the distributed permutation flowshop scheduling problem

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem

Over the last decade many metaheuristics have been applied to the flowshop scheduling problem, ranging from Simulated Annealing or Tabu Search to complex hybrid techniques. Some of these methods provide excellent effectiveness and efficiency at the expense of being utterly complicated. In fact, several published methods require substantial implementation efforts, exploit problem specific speed-...

متن کامل

The distributed permutation flowshop scheduling problem

This paper studies a new generalization of the regular permutation flowshop scheduling problem (PFSP) referred to as the distributed permutation flowshop scheduling problem or DPFSP. Under this generalization, we assume that there are a total of identical factories or shops, each one with machines disposed in series. A set of n available jobs have to be distributed among the factories and then ...

متن کامل

An iterated greedy algorithm for the flowshop scheduling problem with blocking

This paper proposes an iterated greedy algorithm for solving the blocking flowshop scheduling problem for makespan minimization. Moreover, it presents an improved NEH-based heuristic, which is used as the initial solution procedure for the iterated greedy algorithm. The effectiveness of both procedures was tested on some of Taillard’s benchmark instances that are considered to be blocking flows...

متن کامل

Improved genetic algorithm for the permutation flowshop scheduling problem

Genetic algorithms (GAs) are search heuristics used to solve global optimization problems in complex search spaces. We wish to show that the e6ciency of GAs in solving a &owshop problem can be improved signi7cantly by tailoring the various GA operators to suit the structure of the problem. The &owshop problem is one of scheduling jobs in an assembly line with the objective of minimizing the com...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Omega

سال: 2019

ISSN: 0305-0483

DOI: 10.1016/j.omega.2018.03.004