Three 1 MV/40A accelerators in heating neutral beams (HNB) are on track to be implemented in the International Thermonuclear Experimental Reactor (ITER). ITER may produce 500 MWt of power by 2026 and may serve as a green energy roadmap for the world. They will generate -1 MV 1 h long-pulse ion beams to be neutralised for plasma heating. Due to frequently occurring vacuum sparking in the acceler...
متن کاملa study on construction of iranian life tables: the case study of modified brass logit system
چکیده ندارد.
15 صفحه اولEuropean ITER Site Studies: Lessons Learnt in Safety and Licensing
On June 28 th 2005, an agreement was reached amongst the ITER parties on the selection of the European Site of Cadarache in France. As consequence, the ITER generic site safety assessment had to be adapted to the French requirements in order to initiate the licensing process. It is precisely in this point that Europe has been working through the European ITER Site Studies programme. The main ob...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Fusion Technology
سال: 1991
ISSN: 0748-1896
DOI: 10.13182/fst91-a29541