IT project management control and the Control Objectives for IT and related Technology (CobiT) framework

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Selecting IT Control Objectives and Measuring IT Control Capital

COBIT is a well-known framework for IT governance, and provides an extensive list of control objectives for IT managers. However, anecdotal evidence shows that many organizations that use COBIT do not implement the entire framework. Instead, they focus their efforts on only some of COBIT’s control objectives. We argue that this could be due to the bounded rationality of IT managers, which affec...

متن کامل

IT-governance practices: COBIT

With the increasing dependence of enterprises on IT, and with the widely spreading use of e-business, IT governance is attracting increasing worldwide attention. A proper IT governance would promote enterprise performance through intelligent and efficient utilization of IT. In addition, standard IT governance practices would provide a suitable open environment for e-business that provides compa...

متن کامل

the innovation of a statistical model to estimate dependable rainfall (dr) and develop it for determination and classification of drought and wet years of iran

آب حاصل از بارش منبع تأمین نیازهای بی شمار جانداران به ویژه انسان است و هرگونه کاهش در کم و کیف آن مستقیماً حیات موجودات زنده را تحت تأثیر منفی قرار می دهد. نوسان سال به سال بارش از ویژگی های اساسی و بسیار مهم بارش های سالانه ایران محسوب می شود که آثار زیان بار آن در تمام عرصه های اقتصادی، اجتماعی و حتی سیاسی- امنیتی به نحوی منعکس می شود. چون میزان آب ناشی از بارش یکی از مولفه های اصلی برنامه ...

15 صفحه اول

Redesigned Framework and Approach for IT Project Management

In this paper, we consider software development type Information Technology (IT) projects in presenting the redesigned framework and approach for their management. Software development produces intangible products and requirements for software products are difficult to capture as well as they are changing faster than expected. This has made software development type IT projects more complicated...

متن کامل

development and implementation of an optimized control strategy for induction machine in an electric vehicle

in the area of automotive engineering there is a tendency to more electrification of power train. in this work control of an induction machine for the application of electric vehicle is investigated. through the changing operating point of the machine, adapting the rotor magnetization current seems to be useful to increase the machines efficiency. in the literature there are many approaches wh...

15 صفحه اول

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Project Management

سال: 2011

ISSN: 0263-7863

DOI: 10.1016/j.ijproman.2010.03.002