منابع مشابه
The Materials Science beamline upgrade at the Swiss Light Source
The Materials Science beamline at the Swiss Light Source has been operational since 2001. In late 2010, the original wiggler source was replaced with a novel insertion device, which allows unprecedented access to high photon energies from an undulator installed in a medium-energy storage ring. In order to best exploit the increased brilliance of this new source, the entire front-end and optics ...
متن کاملSwiss Light Source VUV beamline, Imaging photoelectron photoion coincidence spectroscopy
An imaging photoelectron photoion coincidence spectrometer at the vacuum ultraviolet (VUV) beamline of the Swiss Light Source is presented and a few initial measurements are reported. Monochromatic synchrotron VUV radiation ionizes the cooled or ambient temperature gas-phase sample. Photoelectrons are velocity focused, with a resolution better than 1 meV in order to detect threshold electrons. ...
متن کاملSurface science at the PEARL beamline of the Swiss Light Source
The Photo-Emission and Atomic Resolution Laboratory (PEARL) is a new soft X-ray beamline and surface science laboratory at the Swiss Light Source. PEARL is dedicated to the structural characterization of local bonding geometry at surfaces and interfaces of novel materials, in particular of molecular adsorbates, nanostructured surfaces, and surfaces of complex materials. The main experimental te...
متن کاملCalibration and standards beamline 6.3.2 at the Advanced Light Source
This bending magnet beamline has been in operation since February 1995 for the characterization of optical elements (mirrors, gratings, multilayers, detectors, etc.) in the energy range 50-1000 eV. Although it was designed primarily for precision reflectometry of multilayer reflecting optics for EUV projection lithography, it has capabilities for a wide range of measurements. The optics consist...
متن کاملInsertion Device Controls at the Swiss Light Source
In the initial phase of the Swiss Light Source (SLS), four insertion devices (ID) will be installed for the first four beamlines. The control system for all the ID’s follows, where possible, a uniform concept to allow a rapid installation schedule, while at the same time allowing for a variety in operational requirements. The components of the control system include the gap drive system with en...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Physics: Conference Series
سال: 2012
ISSN: 1742-6596
DOI: 10.1088/1742-6596/359/1/012003