Investment project selection by applying COPRAS method and imprecise data

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A note on “Supplier selection by the pair of nondiscretionary factors-imprecise data envelopment analysis models”

   Recently, Farzipoor Saen [Journal of the Operational Research Society, 60(11), 1575–1582 (2009)] proposed a method based on data envelopment analysis to identify optimistic efficient suppliers in the presence of nondiscretionary factors-imprecise data. This short communication aims at showing a computational error in computing the value of preference intensity parameter in Farzipoor Saen’s [...

متن کامل

Project selection with limited resources in data envelopment‎ ‎analysis‎

‎In this paper allocating a fixed resource for producing ‎finite projects in order to obtaining a desired level of‎ ‎efficiency will be discussed‎. ‎Note that it is assumed that a ‎vector of limited sources is at hand‎. ‎This vector of resources can‎ ‎be contained human resource‎, ‎budget‎, ‎equipment‎, ‎and facilities‎. ‎In ‎any firm there exist different suggestions from subunits for ‎running...

متن کامل

a note on “supplier selection by the pair of nondiscretionary factors-imprecise data envelopment analysis models”

recently, farzipoor saen [journal of the operational research society, 60(11), 1575–1582 (2009)] proposed a method based on data envelopment analysis to identify optimistic efficient suppliers in the presence of nondiscretionary factors-imprecise data. this short communication aims at showing a computational error in computing the value of preference intensity parameter in farzipoor saen’s [1] ...

متن کامل

APPLICATION OF DEA FOR SELECTING MOST EFFICIENT INFORMATION SYSTEM PROJECT WITH IMPRECISE DATA

The selection of best Information System (IS) project from many competing proposals is a critical business activity which is very helpful to all organizations. While previous IS project selection methods are useful but have restricted application because they handle only cases with precise data. Indeed, these methods are based on precise data with less emphasis on imprecise data. This paper pro...

متن کامل

Applying Method Data Dependence

Concurrency control in object based systems is a new area of research that has only just begun to be addressed. Recent work has proposed using object level locking but this may be unnecessarily restrictive. Data level locking within an object increases concurrency but also introduces substantial lock overhead that makes the approach impractical. This paper proposes using a new approach applying...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Serbian Journal of Management

سال: 2012

ISSN: 1452-4864

DOI: 10.5937/sjm7-2268