Investigating Delays in Libyan Road Construction Projects Using Structural Equation Modelling (SEM)

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Investigating Gender and Major DIF in the Iranian National University Entrance Exam Using Multiple-Indicators Multiple-Causes Structural Equation Modelling

The generalizability aspect of Construct validity, as proposed by Messick (1989), requires that a test measures the same trait across different samples from the same population. Differential Item functioning (DIF) analysis is a key component in the fairness evaluation of educational tests. University entrance exam for the candidates who seek admission into master's English programs (MEUEE) at I...

متن کامل

Exploring Interface Problems in Taiwan’s Construction Projects Using Structural Equation Modeling

Construction projects are complex systems that inherently contain complex interface problems. This study explored the root causes of interface problems in construction projects using structural equation modeling. This technique is a systematic approach that combines factor analysis and path analysis to investigate the causal relationships among multidimensional factors. The literature on constr...

متن کامل

Investigating the Impact of Safety Investment on Safety Culture in Construction Projects - Case Study of Power Plant Construction Projects

Background and aims: Construction industry is known as one of the most perilous industries in that it is involving the hazardous projects as well as the high manpower activities correlating with a high rate of work-related accidents. On the other hand, the high rate of accidents in the industry demanding a big budget for the damages; therefore, safety is strongly emphasized in the construction ...

متن کامل

Delays in construction projects: The case of Jordan

The construction industry is a major player in the economy, generating both, employment and wealth. However many projects experience extensive delays and thereby exceed initial time and cost estimates. A host of causes of construction delays in residential projects were identified and classified according to Drewin’s Open Conversion System. The most common causes were evaluated by using both, t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Engineering & Technology

سال: 2018

ISSN: 2227-524X

DOI: 10.14419/ijet.v7i2.29.14272