INVERSE SCHEDULING IN FLOWSHOP WITH MULTIPLE MACHINES
نویسندگان
چکیده
منابع مشابه
Flexible flowshop scheduling with equal number of unrelated parallel machines
This article addresses a multi-stage flowshop scheduling problem with equal number of unrelated parallel machines. The objective is to minimize the makespan for a given set of jobs in the system. This problem class is NP-hard in the strong sense, so a hybrid heuristic method for sequencing and then allocating operations of jobs to machines is developed. A number of test problems are randomly ge...
متن کاملflexible flowshop scheduling with equal number of unrelated parallel machines
this article addresses a multi-stage flowshop scheduling problem with equal number of unrelated parallel machines. the objective is to minimize the makespan for a given set of jobs in the system. this problem class is np-hard in the strong sense, so a hybrid heuristic method for sequencing and then allocating operations of jobs to machines is developed. a number of test problems are randomly ge...
متن کاملNo-wait flexible flowshop scheduling with no-idle machines
This paper considers a two-stage flexible flowshop scheduling problem with no waiting time between two sequential operations of a job and no idle time between two consecutive processed jobs on machines of the second stage. We show its complexity and present a heuristic algorithm with asymptotically tight error bounds. © 2004 Elsevier B.V. All rights reserved.
متن کاملFlowshop scheduling with identical jobs and uniform parallel machines
The single-stage scheduling problem to minimize the makespan of identical jobs on uniform parallel machines is known to be solvable in polynomial-time. We extend this work to consider multi-stage systems with flowshop configuration. We show that the 2-stage problem may also be solved in polynomial-time and for the number of stages greater than two, the problem is shown to be NP-hard. We present...
متن کاملa bi-objective model for a flowshop scheduling problem with availability constraint of machines
this paper presents a new bi-objective mathematical model for a permutation flowshop scheduling problem with availability constraint in case of preventive maintenance operations on machines. in this paper, preventive maintenance is flexible and there is not a certain time for the maintenance operation; however, time between two consecutive maintenance operations for each machine should not be g...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: INTERNATIONAL JOURNAL OF PRODUCTION TECHNOLOGY AND MANAGEMENT
سال: 2019
ISSN: 0976-6391,0976-6383
DOI: 10.34218/ijptm.10.1.2019.003