Inventory performance under staggered deliveries and autocorrelated demand

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Coordinating lead times and safety stocks under autocorrelated demand

We consider a supply chain in which orders and lead times are linked endogenously, as opposed to assuming lead times are exogenous. This assumption is relevant when a retailer’s orders are produced by a supplier with finite capacity and replenished when the order is completed. The retailer faces demands that are correlated over time – either positively or negatively – which may, for example, be...

متن کامل

Robust Inventory Routing Under Demand Uncertainty

This paper introduces a robust inventory routing problem where a supplier distributes a single product to multiple customers facing dynamic uncertain demands over a finite discrete time horizon. The probability distribution of the uncertain demand at each customer is not fully specified. The only available information is that these demands are independent and symmetric random variables which ca...

متن کامل

Inventory Pooling Under Heavy-Tailed Demand

Risk pooling has been studied extensively in the operations management literature as the basic driver behind strategies such as transshipment, manufacturing flexibility, component commonality, and drop-shipping. This paper explores the benefit of risk pooling in the context of inventory management using the canonical model first studied in Eppen (1979). Specifically, we consider a single-period...

متن کامل

Demand forecast accuracy and performance of inventory policies under multi-level rolling schedule environments

Our incentive is to study the behaviour of lot-sizing rules in a multilevel context when forecast demand is subject to changes within the forecast window. To our knowledge, only Bookbinder and Heath (1988) proposed a lot-sizing study in a multi-echelon rolling schedule with probabilistic demands. But their simulation study was limited to two arborescent structures with 6 nodes. By means of an e...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: European Journal of Operational Research

سال: 2016

ISSN: 0377-2217

DOI: 10.1016/j.ejor.2015.09.060