INTERPRETIVE STRUCTURAL MODELING IN EARNED VALUE MANAGEMENT

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Earned - Value Management Terminology

To the Editor: Although I enjoyed the article titled “Value-Based Software Engineering: A Case Study” (Barry Boehm and Li Guo Huang, March 2003, pp. 33-41), as a newly minted Project Management Professional and a contributor to the Project Management Institute’s Earned Value Analysis team, I was disappointed with the authors’ use of nonstandard terminology. The authors renamed the traditional t...

متن کامل

Interpretive Structural Modeling of Urban Development Empowerment

Cities are centers of technology-based transformations and play pivotal role in economic procedures. Moreover, cities are the social, cultural pivots and center for political challenges either in peace or violence and war. Cities possess a distinguishing share in societies’ economic growth and development. Future of the development of the developing countries is concentrated in cities. Theref...

متن کامل

Interpretive structural modeling of health system financing: Donors participation approach

Background & Aim: Financing of the health system one is one of the four main functions of the health system. It is useful to use the capacity and resources of charities for this purpose. The purpose of this research is to identify and design the financing model of the health system based on the efforts of donors. Methods: This study is a mixed type of research. First the components were identi...

متن کامل

Meta Synthesis and Fuzzy Interpretive Structural Modeling of Talent Supply Chain Management in National Iranian Oil Company

The purpose of this paper was to present the talent supply chain management model of the National Iranian Oil Company. In term of aim, this research is considered an applied and developmental research based on mixed method. The statistic population in qualitative step consisted articles in domstic and foreign scientific information bases related to talent management and in Quantitative step the...

متن کامل

Interpretive Structural Modeling of Barriers to Knowledge Commercialization

Purpose: The present research aimed to develop an interpretive structural model of the barriers to knowledge commercialization (KC) in Payame Noor University (PNU) of Iran.Method: The present research is an applied research of mixed method types in terms of objectives and it is conducted based on confirmatory factor analysis. Fuzzy Delphi method was used for validation and variable screen...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT

سال: 2020

ISSN: 1392-3730,1822-3605

DOI: 10.3846/jcem.2020.12182