Internet?s critical path horizon
نویسندگان
چکیده
منابع مشابه
Extending the Path-Planning Horizon
SINCE typical mobile robotic vehicles have mobility sensors (such as LADAR or stereo) that can only acquire data up to a few tens of meters, a navigation system has no knowledge about the world beyond this sensing horizon. As a result, path planners that rely only on this knowledge to compute paths are unable to anticipate obstacles sufficiently early and has no choice than to plan inefficient ...
متن کاملWhen is the Critical Path Not the Most Critical Path?
This paper challenges the conventional thinking, by proposing a new way to understand and use the term critical-path. At stake is much more than a semantic discussion of terminology. Numerous surveys have confirmed that CPM schedules are used for two primary reasons: project management and dispute resolution. To support either use, the critical-path must be identifiable in a consistent, objecti...
متن کاملUntersuchungen zum Betriebszustand des Internets
Zusammenfassung: Weil das Internet für Wirtschaft und Gesellschaft eine immer unverzichtbarere Rolle einnimmt, steigt das Bedürfnis die Zuverlässigkeit des Internets zu bestimmen und zu bewerten. Eine Messung der Round Trip Time (RTT) und des Paketverlusts ist nur ein erster Schritt. Die Interpretation der Messungen ist der oft vernachlässigte zweite Schritt, der wegen des dynamischen Routings ...
متن کاملIS-IS for IP Internets
IEEE 802.1Qca Path Control and Reservation (PCR) specifies explicit path control via IS-IS in Layer 2 networks in order to move beyond the shortest path capabilities provided by IEEE 802.1aq Shortest Path Bridging (SPB). IS-IS PCR provides capabilities for the establishment and control of explicit forwarding trees in a Layer 2 network domain. This document specifies the sub-TLVs for IS-IS PCR.
متن کاملAcross Multidomain Internets
Internetworks that are global in scale, contain multiple administrative domains, and support a range of services present special requirements for routing. Multiple administrative domains introduce the need for policy-sensitive routing. Service heterogeneity intensifies the requirement for type of service (TOS) routing, as well as other protocol support for handling a range of services, from dat...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: The European Physical Journal B - Condensed Matter
سال: 2004
ISSN: 1434-6028,1434-6036
DOI: 10.1140/epjb/e2004-00117-x