Intelligent Building Load Scheduling Based on Multi-Objective Multi-Verse Algorithm

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Multi-Stage Fuzzy Load Frequency Control Based on Multi-objective Harmony Search Algorithm in Deregulated Environment

A new Multi-Stage Fuzzy (MSF) controller based on Multi-objective Harmony Search Algorithm (MOHSA) is proposed in this paper to solve the Load Frequency Control (LFC) problem of power systems in deregulated environment. LFC problem are caused by load perturbations, which continuously disturb the normal operation of power system. The objectives of LFC are to mini small size the transient deviati...

متن کامل

multi-stage fuzzy load frequency control based on multi-objective harmony search algorithm in deregulated environment

a new multi-stage fuzzy (msf) controller based on multi-objective harmony search algorithm (mohsa) is proposed in this paper to solve the load frequency control (lfc) problem of power systems in deregulated environment. lfc problem are caused by load perturbations, which continuously disturb the normal operation of power system. the objectives of lfc are to mini small size the transient deviati...

متن کامل

An algorithm for multi-objective job shop scheduling problem

Scheduling for job shop is very important in both fields of production management and combinatorial op-timization. However, it is quite difficult to achieve an optimal solution to this problem with traditional opti-mization approaches owing to the high computational complexity. The combination of several optimization criteria induces additional complexity and new problems. In this paper, we pro...

متن کامل

MOEICA: Enhanced multi-objective optimization based on imperialist competitive algorithm

In this paper, a multi-objective enhanced imperialist competitive algorithm (MOEICA) is presented. The main structures of the original ICA are employed while some novel approaches are also developed. Other than the non-dominated sorting and crowding distance methods which are used as the main tools for comparing and ranking solutions, an auxiliary comparison approach called fuzzy possession is ...

متن کامل

Task Scheduling Model Based on Multi-Agent and Multi-Objective Dynamical Scheduling Algorithm

With the increasing number of nodes in distributed systems, the complexity of task scheduling also increases. Therefore, how to schedule tasks reasonably is becoming more and more significant. Most traditional algorithms only consider a single condition without thinking over dynamic characteristic of system and tasks and lack of comprehensive measures. Therefore they cannot meet the needs of di...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Energy and Power Engineering

سال: 2021

ISSN: 1949-243X,1947-3818

DOI: 10.4236/epe.2021.134b003