Integration of uncooled scraper elements and its diagnostics into Wendelstein 7-X

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The Set of Diagnostics for the First Operation Campaign of the Wendelstein 7-X Stellarator

Wendelstein 7-X (W7-X) is a large optimized stellarator (B=2.5T, V=30m) aiming at demonstrating the reactor relevance of the optimized stellarators. In summer this year (2015) W7-X will begin its first operation phase (OP1.1) with five inertially cooled inboard limiters made of graphite. Assuming the heat loads can be spread out evenly between the limiters, 1 second discharges at 2 MW of heatin...

متن کامل

Commissioning of the magnetic diagnostics during the first operation phase at Wendelstein 7-X

during the first operation phase at Wendelstein 7-X K. Rahbarnia1, T. Andreeva1, A. Cardella2, B.B. Carvalho3, M. Endler1, D. Hathiramani1, J. Geiger1, O. Grulke1, S. Lazerson4, U. Neuner1, J. Svensson1, H. Thomsen1, A. Werner1 and Wendelstein 7-X Team 1 Max-Planck Institute for Plasma Physics, Wendelsteinstr. 1, 17489 Greifswald, Germany 2 Fusion for Energy, Boltzmannstr. 2, 85748 Garching, Ge...

متن کامل

Diagnostics development for quasi-steady-state operation of the Wendelstein 7-X stellarator (invited).

The critical issues in the development of diagnostics, which need to work robust and reliable under quasi-steady state conditions for the discharge durations of 30 min and which cannot be maintained throughout the one week duration of each operation phase of the Wendelstein 7-X stellarator, are being discussed.

متن کامل

The construction of the Wendelstein 7-X stellarator

The construction status of the large superconducting stellarator Wendelstein 7-X is reported. The manufacturing and tests of the main components are reviewed and major design tasks during the device assembly phase are summarized. The assembly is currently proceeding on three out of five assembly stands. Four out of ten magnet half-modules are completed. Major work packages are the electric and ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Fusion Engineering and Design

سال: 2017

ISSN: 0920-3796

DOI: 10.1016/j.fusengdes.2017.05.115