Integrating rolling stock scheduling with train unit shunting
نویسندگان
چکیده
منابع مشابه
Solving Rolling Stock Scheduling Problems at SNCF
We present a generic mathematical modeling approach for solving rolling stock scheduling problems. Our approach is based on a time-space network and a multi-commodity flow model; in order to deal with the various types of rolling stock scheduling problems faced by SNCF planners, it integrates numerous modeling settings and features including maintenance routing requirements which are treated by...
متن کاملEnergy efficiency strategies for rolling stock and train operation
Typical passenger trains have specific weights between 400 and 800 kg per seat, but some high speed trains such as the German ICE 2 have values as high as 1100 kg/seat. Although there are some railway-specific limits to light-weight efforts, such as side wind stability, the Japanese Shinkansen (537 kg per seat) and the Copenhagen suburban trains (360kg per seat) may serve as benchmarks for ligh...
متن کاملOnline Train Shunting
At the occasion of ATMOS 2012, Tim Nonner and Alexander Souza defined a new train shunting problem that can roughly be described as follows. We are given a train visiting stations in a given order and cars located at some source stations. Each car has a target station. During the trip of the train, the cars are added to the train at their source stations and removed from it at their target stat...
متن کاملIntegrated Train Timetabling and Rolling Stock Scheduling Model Based on Time-Dependent Demand for Urban Rail Transit
1 The congestion problem of urban transportation is becoming increasingly critical for many 2 metropolises. The Urban Rail Transit (URT) system has attracted substantial attention due to its 3 safety, high speed, high capacity and sustainability. With a focus on providing a holistic 4 modelling framework for train scheduling problems, this paper proposes a novel optimization 5 methodology that ...
متن کاملRe-scheduling in railways: the Rolling Stock Balancing Problem
This paper addresses the Rolling Stock Balancing Problem (RSBP). This problem arises at a passenger railway operator when the rolling stock has to be re-scheduled due to changing circumstances. These problems arise both in the planning process and during operations. The RSBP has as input a timetable and a rolling stock schedule where the allocation of the rolling stock among the stations does n...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: European Journal of Operational Research
سال: 2017
ISSN: 0377-2217
DOI: 10.1016/j.ejor.2016.10.053