Integrating Preventive Maintenance Scheduling As Probability Machine Failure And Batch Production Scheduling
نویسندگان
چکیده
منابع مشابه
JIT single machine scheduling problem with periodic preventive maintenance
This article investigates a JIT single machine scheduling problem with a periodic preventive maintenance. Also to maintain the quality of the products, there is a limitation on the maximum number of allowable jobs in each period. The proposed bi-objective mixed integer model minimizes total earliness-tardiness and makespan simultaneously. Due to the computational complexity of the problem, mult...
متن کاملJoint optimization of production scheduling and machine group preventive maintenance
Joint optimization models were developed combining group preventive maintenance of a series system and production scheduling. In this paper, we propose a joint optimization model to minimize the total cost including production cost, preventive maintenance cost, minimal repair cost for unexpected failures and tardiness cost. The total cost depends on both the production process and the machine m...
متن کاملIntegrating noncyclical preventive maintenance scheduling and production planning for a single machine
This paper deals with the problem of integrating noncyclical preventive maintenance and tactical production planning for a single machine. We are given a set of products that must be produced in lots during a specified finite planning horizon. The maintenance policy suggests possible preventive replacements at the beginning of each production planning period, and minimal repair at machine failu...
متن کاملIntegrated production and preventive maintenance scheduling for a single machine with failure uncertainty
Article history: Received 27 June 2012 Received in revised form 4 September 2014 Accepted 11 December 2014 Available online 20 December 2014
متن کاملLong Term Cost Effective Preventive Maintenance Scheduling
Preventive maintenance scheduling of generating units is addressed as a long-term scheduling in power system studies aiming to increase the reliability incorporating cost reduction. It consists of knowing which generating units should be shut down for regular safety inspection. In this paper, a new formulation of preventive maintenance scheduling associated with cost reduction index (CRI) is pr...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: ComTech: Computer, Mathematics and Engineering Applications
سال: 2016
ISSN: 2476-907X,2087-1244
DOI: 10.21512/comtech.v7i2.2247