Integrating Preventive Maintenance Planning and Production Scheduling under Reentrant Job Shop

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Minimizing job tardiness using integrated preventive maintenance planning and production scheduling

Production scheduling and preventive maintenance planning decisions are inter-dependent but most often made independently. Given that maintenance affects available production time and elapsed production time affects the probability of machine failure, this interdependency seems to be overlooked in the literature. We propose an integrated model that simultaneously determines production schedulin...

متن کامل

Flexible job shop scheduling under availability constraints

In this paper, an exact geometric algorithm is presented for solving two-job sequencing and scheduling problems in flexible flow shop and job shop environments while the resources are (un)available in some time periods and processors (un)availability is the same in all work centers. This study seems utterly new and it is applicable to any performance measure based on the completion time. The in...

متن کامل

Integrating noncyclical preventive maintenance scheduling and production planning for multi-state systems

This paper integrates noncyclical preventive maintenance with tactical production planning in multistate systems. The maintenance policy suggests noncyclical preventive replacements of components, and minimal repair on failed components. The model gives simultaneously the appropriate instants for preventive maintenance, and production planning decisions. It determines an integrated lot-sizing a...

متن کامل

Integrating noncyclical preventive maintenance scheduling and production planning for a single machine

This paper deals with the problem of integrating noncyclical preventive maintenance and tactical production planning for a single machine. We are given a set of products that must be produced in lots during a specified finite planning horizon. The maintenance policy suggests possible preventive replacements at the beginning of each production planning period, and minimal repair at machine failu...

متن کامل

Scheduling of a hub reentrant job shop to minimize makespan

This paper focuses on a hub reentrant shop scheduling problem which is motivated by actual packing production line in the iron and steel industry. There are five operations for processing a job where three operations must be processed on a hub machine, and between any two consecutive operations on the hub machine, two operations must be processed on other two secondary machines, respectively. W...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Mathematical Problems in Engineering

سال: 2017

ISSN: 1024-123X,1563-5147

DOI: 10.1155/2017/6758147