Integrated Single Item Lot-Sizing and Quality Inspection Planning

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Lot sizing with rework and different inspection costs

This paper deals with the single machine multi-product lot scheduling problem in which defective items are produced in any production run of each product. We have adopted the common cycle scheduling policy and assumed that the setup times for production of each product can be non-zero. Further, we have assumed that defective items will be reworked and the inspection costs during the normal prod...

متن کامل

Single item lot-sizing with non-decreasing capacities

We consider the single item lot-sizing problem with capacities that are non-decreasing over time. When the cost function is i) non-speculative or Wagner-Whitin (for instance, constant unit production costs and non-negative unit holding costs), and ii) the production set-up costs are non-increasing over time, it is known that the minimum cost lotsizing problem is polynomially solvable using dyna...

متن کامل

The single-item lot-sizing problem with immediate lost sales

e introduce a profit maximization version of the well-known Wagner-Whitin model for the deterministic uncapacitated single-item lot-sizing problem with lost sales. Demand cannot be backlogged, but it does not have to be satisfied, either. Costs and selling prices are assumed to be time-variant, differentiating our model from previous models with lost sales. Production quantities and levels of l...

متن کامل

Three Meta-heuristic Algorithms for the Single-item Capacitated Lot-sizing Problem (RESEARCH NOTE)

This paper proposes a mixed integer programming model for single-item capacitated lot-sizing problem with setup times, safety stock, demand shortages, outsourcing and inventory capacity. Due to the complexity of problem, three meta-heuristics algorithms named simulated annealing (SA), vibration damping optimization (VDO) and harmony search (HS) have been used to solve this model. Additionally, ...

متن کامل

lot sizing with rework and different inspection costs

this paper deals with the single machine multi-product lot scheduling problem in which defective items are produced in any production run of each product. we have adopted the common cycle scheduling policy and assumed that the setup times for production of each product can be non-zero. further, we have assumed that defective items will be reworked and the inspection costs during the normal prod...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IFAC-PapersOnLine

سال: 2016

ISSN: 2405-8963

DOI: 10.1016/j.ifacol.2016.07.693