Distribution utilities aim to operate and plan their network in a secure economical way. The prime focus of this work is assist by developing new integrated approach which considers the impacts system reliability distribution planning (DSP). This merges different problems together solves them two-stage process, as follows: 1. cable routing optimal location number switching devices (circuit breakers reclosers); 2. tie switches. Moreover, possibility installing options, with prices capacities, included. optimization algorithm designed using mixed-integer programming (MIP). developed analytically evaluates relationships between components dynamically updates indices, failure rate restoration time, every node system. has been tested on two systems. Despite complexity exhaustiveness problem, MIP converges provides solution for studied scenario. results show that an enables obtain more comprehensive solutions. understanding impact parameter variation categorize priorities decision making process optimally invest respect reliability.
منابع مشابه
A Customer Oriented Approach for Distribution System Reliability Improvement using Optimal Distributed Generation and Switch Placement
The reliability of distribution networks is inherently low due to their radial nature, consequently distribution companies (DisCos) usually seek to improve the system reliability indices with the minimum possible investment cost. This can be known as system-oriented reliability planning (SORP). However, there can exist some customers that are not satisfied by their reliability determined by ado...
متن کاملReliability and Supply Security based Method for Simultaneous Placement of Sectionalizer Switch and DER Units
This paper presents a new and useful methodology for simultaneous allocation of sectionalizer switches and distributed energy resources (DERs) considering both reliability and supply security aspects. The proposed algorithm defines the proper locations of sectionalizer switching devices in radial distribution networks considering the effect of DER units in the presented cost function and other ...
متن کاملReliability-Aware Placement and Routing for FPGAs
Soft errors are intermittent malfunctions of hardware that are not reproducible. They may affect the data integrity and affect the system operation. These errors are growing reliability threat in VLSI system design. A soft error occurring in a memory cell or register is called a Single Event Upset (SEU). Designs mapped into Field Programmable Gate Arrays (FGPAs) are more vulnerable to soft erro...
متن کاملOptimal Switch Placement in Radial Distribution System Using PSO
This paper proposes an optimization method for planning adequate number and location of automatic switches in a radial distribution system. The purpose is to maximize the profit of that service reliability indices achieve the required level. First, a network equivalent technique is introduced to calculate the reliability indices. Second, by using the equivalent method, system reliability indice...
متن کاملDG integrated multistage distribution system expansion planning
In this paper, a framework is presented to solve the problem of multistage distribution system expansion planning in which installation and/or reinforcement of substations, feeders and distributed generation units are taken into consideration as possible solutions for system capacity expansion. The proposed formulation considers investment, operation, and outage costs of the system. The expansi...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Energy Reports
سال: 2021
ISSN: ['2352-4847']
DOI: https://doi.org/10.1016/j.egyr.2021.05.045