Simultaneous production planning and scheduling in a hybrid flow shop with time periods and work shifts
Simultaneous production planning and scheduling has been identified as one of the most important factors that affect the efficient implementation of planning and scheduling operations for the production systems. In this paper, simultaneous production planning and scheduling is applied in a hybrid flow shop environment, which has numerous applications in real industrial settings. In this problem...
متن کاملA three-stage assembly flow shop scheduling problem with blocking and sequence-dependent set up times
This paper considers a three-stage assembly flowshop scheduling problem with sequence-dependent setup < /div> times at the first stage and blocking times between each stage in such a way that the weighted mean completion time and makespan are minimized. Obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time using traditiona...
متن کاملTwo Stage Flow Shop Scheduling Problem Including Transportation Time and Weightage of Jobs with Branch and Bound Method
متن کامل
A Flow shop Production Planning Problem with basic period policy and Sequence Dependent set up times
Many authors have examined lot sizing, scheduling and sequence of multi-product flow shops, but most of them have assumed that set up times are independent of sequence. Whereas dependence of set up times to sequence is more common in practice. Hence, in this paper, we examine the discussed problem with hypothesis of dependence of set up times to sequence and cyclic schedule policy in basic peri...
متن کاملCustomer Order Scheduling with Job-Based Processing and Lot Streaming In A Two-Machine Flow Shop
This paper considers a customer order scheduling (COS) problem in which each customer requests a variety of products processed in a two-machine flow shop. A sequence-independent attached setup for each machine is needed before processing each product lot. We assume that customer orders are satisfied by the job-based processing approach in which the same products from different customer orders f...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Simulation Modelling
سال: 2018
ISSN: 1726-4529
DOI: 10.2507/ijsimm17(3)co15