Integrated Production and Transportation Scheduling on Parallel Batch-Processing Machines

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An improved on-line algorithm for scheduling on two unrestrictive parallel batch processing machines

We consider the problem of on-line scheduling a set of n jobs on two parallel batch processing machines. Each machine can handle an infinite number of jobs as a batch simultaneously. The processing time of a batch is the time required for processing the longest job in the batch. Each job becomes available at its release date, which is not known in advance, and its processing time only becomes k...

متن کامل

Online Over Time Scheduling on Parallel-Batch Machines: A Survey

Online scheduling is a rapidly developed branch in scheduling theory. In this paper, we present an extensive survey for online over time scheduling on parallel-batch machines. Some open problems are proposed for further research.

متن کامل

Integrated scheduling of production and rail transportation

Article history: Received 9 September 2013 Received in revised form 14 February 2014 Accepted 24 May 2014 Available online 9 June 2014

متن کامل

Optimal Semi-Online Algorithm for Scheduling on Two Parallel Batch Processing Machines

This paper deals with semi-online scheduling on two parallel batch processing machines with jobs’ nondecreasing processing times. Our objective is to minimize the makespan. A batch processing machine can handle up to B jobs simultaneously. We study unbounded model which means that B is sufficiently large. The jobs that are processed together construct a batch, and all jobs in a batch start and ...

متن کامل

Parallel-Batch Scheduling and Transportation Coordination with Waiting Time Constraint

This paper addresses a parallel-batch scheduling problem that incorporates transportation of raw materials or semifinished products before processing with waiting time constraint. The orders located at the different suppliers are transported by some vehicles to a manufacturing facility for further processing. One vehicle can load only one order in one shipment. Each order arriving at the facili...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IEEE Access

سال: 2019

ISSN: 2169-3536

DOI: 10.1109/access.2019.2946801