Integrated process planning, WSPT scheduling and WSLK due-date assignment using genetic algorithms and evolutionary strategies

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Genetic algorithms in integrated process planning and scheduling

This paper presents a review of genetic algorithms in integrated process planning and scheduling problems. According to the literature information, process planning and scheduling are two functions that were sequentially carried out in a manufacturing system, where scheduling was performed after process plans had been generated. Their integration highly improves the performance and efficiency o...

متن کامل

Solving Weighted Number of Operation Plus Processing Time Due-Date Assignment, Weighted Scheduling and Process Planning Integration Problem Using Genetic and Simulated Annealing Search Methods

Traditionally, the three important manufacturing functions, which are process planning, scheduling and due-date assignment, are performed separately and sequentially. For couple of decades, hundreds of studies are done on integrated process planning and scheduling problems and numerous researches are performed on scheduling with due date assignment problem, but unfortunately the integration of ...

متن کامل

Due-date assignment and parallel-machine scheduling with deteriorating jobs

In this paper we study the problem of scheduling n deteriorating jobs on m identical parallel machines. Each job’s processing time is a nondecreasing function of its start time. The problem is to determine an optimal combination of the due-date and schedule so as to minimize the sum of the due-date, earliness and tardiness penalties. We show that this problem is NP-hard, and we present a heuris...

متن کامل

Due-date assignment and maintenance activity scheduling problem

In the scheduling problem addressed in this note we have to determine: (i) the job sequence, (ii) the (common) due-date, and (iii) the location of a rate modifying (maintenance) activity. Jobs scheduled before (after) the due-date are penalized according to their earliness (tardiness) value. The processing time of a job scheduled after the maintenance activity decreases by a job-dependent facto...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: An International Journal of Optimization and Control: Theories & Applications (IJOCTA)

سال: 2017

ISSN: 2146-5703,2146-0957

DOI: 10.11121/ijocta.01.2018.00412