Integrated Planning for Regional Development Planning with Low Carbon Development Constraint under Uncertainty: A Case Study of Qingpu District, Shanghai
نویسندگان
چکیده
Regional development planning systems contain multiple uncertainties which come from economic restructuring, resource management, carbon peak action, environmental protection, and other factors, it is difficulty to handle all of these in one method. In order solve this problem, a new model developed study combines an interval fuzzy program with quality for regional provide optimal solutions. The put forward based on parameter programming (IPP) programing (FP). used calculate water capacity atmospheric capacity, are set as constraint conditions the model. meet requirements low added model, decision makers can choose satisfaction level constraints their preferences. results suggest that methodology applicable system within period. be generate series optimization schema under credibility levels, ensuring both societal demands requirements, considering proper balance between expected benefits risks violating constraint.
منابع مشابه
The role of government decisions on regional development with the approach spatial planning and sustainable development
Power as an institution, governance as structure and spatial organization is considered as an organizational tool in the service of the goals and aspirations of the institutions of power and governance structure. In this framework the spatial organization and geographic environment is a result of social organization (social, economic, political), and its natural and ecological system. Human aut...
متن کاملIntegrated Inspection Planning and Preventive Maintenance for a Markov Deteriorating System Under Scenario-based Demand Uncertainty
In this paper, a single-product, single-machine system under Markovian deterioration of machine condition and demand uncertainty is studied. The objective is to find the optimal intervals for inspection and preventive maintenance activities in a condition-based maintenance planning with discrete monitoring framework. At first, a stochastic dynamic programming model whose state variable is the ...
متن کاملConsidering a Model for Sustainable Energy Planning Under Uncertainty
In this paper, real options theory is utilized to evaluate the effect of uncertain electricity and CO2 costs on speculation conduct. Methodologically, the allegiance of the newspaper in this appreciation is that uncertainty is not just stopped down as far as stochastic processes and their fluctuation, additionally as far as expected and acknowledged procedures, i.e. the procedures, w...
متن کاملMulti-robot planning under uncertainty with communication: a case study
Although Dec-POMDP techniques can be useful to modeling a wide range of problems, their practical application is limited by the inherent computational complexity of the algorithms currently available to solve such models. The application of these techniques is typically restricted to theoretical examples. This work studies the application of a particular type of Dec-POMDP (a multiagent POMDP) m...
متن کامل4D geomechanical simulations for field development planning
3D and 4D geomechanical can be time-consuming to build and calibrate. However, once such a model is built, it is relative straightforward to use this model for various field development and management applications. In so doing, the return on the initial investment of time and effort in the creation of a 4D geomechanical model can be substantial. I present a case study where a 4D geomechanical m...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Sustainability
سال: 2021
ISSN: ['2071-1050']
DOI: https://doi.org/10.3390/su131910511