Integrated Model for Selection the Prequalification Criteria of Contractor
نویسندگان
چکیده
منابع مشابه
An AHP model for construction contractor prequalification
Given that contractor plays a critical role in any construction project, contractor selection constitutes key decision for public authorities. Prequalification, i.e. the elimination of incompetent contractors from the bidding process according to a predetermined set of criteria, is a frequently practiced procedure in many countries, including Greece. In order to enhance the performance levels o...
متن کاملPrequalification of Construction Contractor using a FAHP
Analytical hierarchy process (AHP) as multiple criteria decision making tools can be used in the problems with spatial nature like selection of construction contractor. In this study the application of AHP and its weakness and strength and ultimately the fuzzy modified analytical hierarchy process (FAHP) is proposed after the concept of fuzziness, uncertainty and vagueness. A triangular fuzzy u...
متن کاملthe use of appropriate madm model for ranking the vendors of mci equipments using fuzzy approach
abstract nowadays, the science of decision making has been paid to more attention due to the complexity of the problems of suppliers selection. as known, one of the efficient tools in economic and human resources development is the extension of communication networks in developing countries. so, the proper selection of suppliers of tc equipments is of concern very much. in this study, a ...
15 صفحه اولCp - Dss : Decision Support System for Contractor Prequalification
A prototype decision support/expert system for contractor prequalification, CP-DSS, is described. The system firstly evaluates contractors' capabilities according to project specific criteria. It then identifies any risks that may be caused by contractors. Finally, contractors are appraised according to their likely performance, management capability, reputation, resources, progress, competitiv...
متن کاملA Fuzzy Neural Network Approach for Contractor Prequalification
Nonlinearity, uncertainty and subjectivity are the three predominant characteristics of contractors prequalification which cause the process more of an art than a scientific evaluation. A fuzzy neural network (FNN) model, amalgamating both the fuzzy set and neural network theories, has been developed aiming to improve the objectiveness of contractor prequalification. Through the FNN theory, the...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Lecture Notes on Software Engineering
سال: 2014
ISSN: 2301-3559
DOI: 10.7763/lnse.2014.v2.128