Integrated internal truck, yard crane and quay crane scheduling in a container terminal considering energy consumption
نویسندگان
چکیده
منابع مشابه
Integrated internal truck, yard crane and quay crane scheduling in a container terminal considering energy consumption
Container terminals mainly include three types of handling equipment, i.e., quay cranes (QCs), internal trucks (ITs) and yard cranes (YCs). Due to high cost of the handling equipment, container terminals can hardly purchase additional handling equipment. Therefore, the reasonable scheduling of these handling equipment, especially coordinated scheduling of the three types of handling equipment, ...
متن کاملThe Integrated Optimization of Quay Crane-Yard Truck Scheduling in the Container Terminal with Uncertain Factors
The key to improve the container terminal efficiency is the integrated optimization of the quay crane (QC) and the yard truck (YT) scheduling, which is normally settled separately and considered in a certain condition in classical literatures. To improve the operation efficiency and simulate the practical operation, a PSO-based integrated QC-YT scheduling optimization model with uncertain facto...
متن کاملYard crane scheduling in port container terminals using genetic algorithm
Yard crane is an important resource in container terminals. Efficient utilization of the yard crane significantly improves the productivity and the profitability of the container terminal. This paper presents a mixed integer programming model for the yard crane scheduling problem with non- interference constraint that is NPHARD in nature. In other words, one of the most important constraints in...
متن کاملSimultaneous Optimization of Berth Allocation, Quay Crane Assignment and Quay Crane Scheduling Problems in Container Terminals
In this work, we focus on the integrated planning of the following problems faced within the context of seaside operations at container terminals: berth allocation, quay crane assignment, and quay crane scheduling. First, we formulate a new binary integer linear program for the integrated solution of the berth allocation and quay crane assignment problems called BACAP. Then we extend it by inco...
متن کاملA Quay Crane Scheduling Model in Container Terminals
This paper discusses the problem of scheduling quay cranes, the most important equipment in port terminals. A simulation model is developed for evaluating time of quay cranes. Then a dynamic scheduling model using objective programming for quay cranes is developed based on genetic algorithm approach. Finally, numerical experiments on a specific container terminal are made for propose approach. ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Expert Systems with Applications
سال: 2015
ISSN: 0957-4174
DOI: 10.1016/j.eswa.2014.11.016