Integrated condition-based track maintenance planning and crew scheduling of railway networks

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A heuristic approach to railway track maintenance scheduling

Travelling safely and comfortably on high speed railway lines requires excellent conditions of the whole railway infrastructure in general and of the railway track geometry in particular. The maintenance process required to achieve such excellent conditions is largely complex and expensive, demanding an increased amount of both human and technical resources. In this framework, an optimal schedu...

متن کامل

Two Mathematical Models for Railway Crew Scheduling Problem

Railway crew scheduling problem is a substantial part of the railway transportation planning, which aims to find the optimal combination of the trip sequences (pairings), and assign them to the crew complements. In this problem, each trip must be covered by at least one pairing. The multiple-covered trips lead to impose useless transfers called “transitions”. In this study, a new ma...

متن کامل

Heuristic based track maintenance scheduling optimisation

The maintenance of railway track is highly relevant for the service quality and safety. This task demands huge technical and human resources. Therefore an optimal deployment of the available resources is crusial for the cost-effectiveness of railway operation. Furthermore, the track geometry maintenance activities need to be planned up to two years in advance. For this reason the French railway...

متن کامل

A Comprehensive Approach for Railway Crew Scheduling Problem (Case Study: Iranian Railway Network)

The aim of this study is to propose a comprehensive approach for handling the crew scheduling problem in the railway systems. In this approach, the information of different railway trips are considered as input and the problem is divided to three separated phases. In phase I, we generate all feasible sequences of the trips, which are named as the pairings. A depth-first search algorithm is deve...

متن کامل

Integrated and Dynamic Vehicle and Crew Scheduling

Dennis Huisman geboren te Dordrecht. Acknowledgements Thinking back on the last four-and-a-half years, immediately Richard Freling comes in my mind. I met him about five years ago for the first time, when I started to write my master thesis, which was an extension of Richard's research on integrated vehicle and crew scheduling. Later on, after I became a PhD student, we had a lot of discussions...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Transportation Research Part C: Emerging Technologies

سال: 2019

ISSN: 0968-090X

DOI: 10.1016/j.trc.2019.05.045