Integrated capacity and inventory management with capacity acquisition lead times

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Integrated capacity and inventory management with capacity acquisition lead times

In this paper we consider a make-to-stock production system whose permanent production capacity can be increased temporarily by making use of some contingent resources, while this capacity acquisition has a constant lead time associated with it. We present a model where the capacity management problem is handled in an integrated manner with the inventory management, under non-stationary and sto...

متن کامل

Inventory management with advance capacity information

In this paper we study a periodic review single item single stage inventory system with stochastic demand. In each time period the system must order none or at least as much as a minimum order quantity Qmin. Since the optimal structure of an ordering policy with a minimum order quantity is complicated, we propose an easy-to-use policy, which we call (R,S,Qmin) policy. Assuming linear holding an...

متن کامل

Capacity Expansion with Lead Times and Correlated Random Demand

The combination of uncertain demand and lead times for installing capacity creates the risk of shortage during the lead time, which may have serious consequences for a service provider with dependent customers. This paper analyzes a model of capacity expansion with correlated random demand and a fixed lead time for adding capacity. We develop and prove the form of an optimal policy for expansio...

متن کامل

Capacity Expansion with Lead Times and Autocorrelated Random Demand

The combination of uncertain demand and lead times for installing capacity creates the risk of shortage during the lead time, which may have serious consequences for a service provider with dependent customers. This paper analyzes a model of capacity expansion with autocorrelated random demand and a fixed lead time for adding capacity. To provide a specified level of service, a discrete time ex...

متن کامل

Spare Parts Inventory Management with Demand Lead–Times and Rationing

We study an inventory system that consists of two demand classes. The orders in the first class need to be satisfied immediately, whereas the orders in the second class are to be filled in a given demand lead–time. The two classes are also of different criticality. For this system, we propose a policy that rations the non–critical orders. Under a one-for-one replenishment policy with backorderi...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: European Journal of Operational Research

سال: 2009

ISSN: 0377-2217

DOI: 10.1016/j.ejor.2008.04.016