This paper presents the determination of insulation coordination for phase-to-ground switching over voltages by a practical method in which effect overvoltage waveshape, especially impact time to crest on strength is considered. work carried out world’s first 1200 kV transmission line modelling it PSCAD.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

System Aspects of 1100kV AC Transmission Technologies in Japan: Solutions for Network Problems Specific to UHV AC Transmission System and Insulation Coordination

For development of a UHV transmission system, sophisticated system design is indispensable to deal with increased charging MVA and higher transmission voltage. Furthermore, for realization of technical and economical optimization throughout the design of the transmission line and the substation, solutions for network problems specific to UHV AC transmission system and problems with insulation c...

متن کامل

Estimation of New Weighted Controlled Switching Overvoltage by RBFN Model

Mitigating switching overvoltages (SOVs) and conducting well-suited insulation coordination for handling stresses are very important in UHV transmission Lines. The best strategy in the absence of arresters is controlled switching (CS). Although elaborate works on electromagnetic transients are considered in the process of designing transmission systems, such works are not prevalent in day-to-da...

متن کامل

Tonal Component of the Audible Noise from Uhv-ac Transmission Lines

On high voltage overhead transmission lines foul weather usually results in audible noise with a broadband crackling and a tonal component at twice the mains frequency (2f). In the 1960s to 1980s, when the implementation of UHV-AC transmission with voltages up to 1500 kV was being considered, an intensive research into the broadband noise was initiated. However, only a scant amount of literatur...

متن کامل

Power Upgrading of Transmission Line by Combining AC–DC Transmission

Long extra high voltage (EHV) ac lines cannot be loaded to their thermal limits in order to keep sufficient margin against transient instability. With the scheme proposed in this project, it is possible to load these lines very close to their thermal limits. The conductors are allowed to carry usual ac along with dc superimposed on it. The added dc power flow does not cause any transient instab...

متن کامل

Coordination of Transmission Line Transfer Capabilities

This is a project report from the Power Systems Engineering Research Center (PSERC). PSERC is a multi-university Center conducting research on challenges facing a restructuring electric power industry and educating the next generation of power engineers. More information about PSERC can be found at the Center's website: The project has been carried out in collaboration between the Washington St...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: The Journal of CPRI

سال: 2023

ISSN: ['0973-0338']

DOI: https://doi.org/10.33686/pwj.v18i2.1086