منابع مشابه
Electric Field Investigation in MV PILC Cables with Void Defect
Abstract—Worldwide, most PILC MV underground cables in use are approaching the end of their design life; hence, failures are likely to increase. This paper studies the electric field and potential distributions within the PILC insulted cable containing common void-defect. The finite element model of the performance of the belted PILC MV underground cable is presented. The variation of the elect...
متن کاملinvestigation of gassing behavior, electric and dielectric properties of different insulating fluids.
ترانسفورماتورهای قدرت از اجزای اصلی شبکه تامین انرژی الکتریکی می باشند که عملکرد قابل اطمینان ترانسفورماتورها یکی از فاکتورهای مهم و تعیین کننده در تامین انرژی الکتریکی محسوب می شود. در نتیجه بررسی و مانیتور عملکرد ترانسفورماتورها در شبکه و همچنین عیب یابی این ترانسفورماتورها غیرقابل اجتناب و ضروری می باشد. به طور کلی عایق های مایع در صنعت فشار قوی کاربردهای متفاوتی دارند که مهمترین وظیفه آنها...
15 صفحه اولThe Main Cables – Catenary Cables
Thus far, the main cables have been referred to as catenary cables. For a cable to assume the shape of a catenary, the load on the cable must be uniformly distributed. Under the spaced suspender loading, the shape is closer to a parabola. The difference between the two is very slight. Since the equation for a parabola is easier to work with, most engineers use the parabola equation in the desig...
متن کاملDiagnostics of Electric Cables in Nuclear Power Plants via Joint Time-Frequency Domain Reflectometry
Defective cables in the electric power systems of nuclear power plants can cause a component to fail, resulting in potential safety concerns. Due to this problem, a non-destructive, non-intrusive condition assessment technique is highly desirable. Joint time-frequency domain reflectometry (JTFDR) is proposed and verified to be effective for cross-linked polyethylene (XLPE) cable, which serves c...
متن کاملUnderground electric cables a correct evaluation of the soil thermal resistance
Nowadays companies supplying medium/high voltage electric energy, near residential areas, tend to use underground cables laying. Hence the design engineer is required to estimate the thermal resistance around the underground cable to perform a right dimensioning of the cables; as a matter of fact what it should be avoided is the overheating determined by a bad heat dissipation due to the Joule ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: MRS Bulletin
سال: 1995
ISSN: 0883-7694,1938-1425
DOI: 10.1557/s0883769400044730