Instrumentation at Kawayama Mill

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Heterodyne Instrumentation at the CSO

The Caltech Submillimeter observatory (CSO) is one of the World’s premier submillimeter telescopes. It consists of a 10.4 meter diameter Leighton radio dish situated in a compact dome near the summit of Mauna Kea, Hawaii. The telescope has been operating under a contract from the National Science Foundation on a regular basis since 1988. For the first time heterodyne Superconducting-Insulating-...

متن کامل

Tardiness Risk at a Steel Mill

A customer who places a tentative order at a steel mill customarily receives a due-date quotation, namely the date by which the mill says that it will ship the order. The steel mill wants the due date to be early enough so that the customer won’t balk (withdraw the order), but late enough so that the probability of tardiness is low. This note obtains expressions for the tardiness probability at...

متن کامل

Syrup Screening at the Malelane Mill

During the 1999-crushing season, the Malelane Mill installed vibratory screens after the quadruple effect evaporator. The purpose of the screens was to separate out any residual scale originating from the chemical cleaning of the evaporator vessels. This strategy was adopted after attempts to improve the flush out of the evaporator vessels after chemical cleaning proved ineffective in removing ...

متن کامل

Optical NeuroImaging Instrumentation at Clarkson University

Wide-field intrinsic optical signal (IOS) imaging is used in functional cortex mapping for its excellent spatial resolution. Extrinsic dye signals can be introduced as extrinsic optical signal (EOS) imaging to improve signal noise ratio and temporal resolution. This paper describes the wide-field IOS/EOS imaging instrumentation at Clarkson University’s Center for Rehabilitation Engineering, Sci...

متن کامل

Advanced Neutron Instrumentation at FRM-II

The construction of the new German high flux neutron source FRM-II is finished and FRM-II is waiting for its licence to start nuclear operation. With the beginning of the routine operation 22 instruments will be in action, including 5 irradiation facilities and 17 beam tube instruments, most of them use neutron scattering techniques. Additional instruments are under construction. Some of these ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: FLOTATION

سال: 1963

ISSN: 1883-9142,0427-7775

DOI: 10.4144/rpsj1954.1963.21_2