Simulation of tunnel boring machine utilization: A case study
Utilization is one of the main managerial factors that is applied for construction process analysis well. It directly affects the project duration and construction costs. Therefore, a utilization study in tunneling projects is essential. In this work, the utilization of an earth pressure balance Tunnel Boring Machine (TBM) in Tabriz urban railway project was studied using the Monte Carlo simula...
متن کاملAirflow inside tunnel boring machine: A numerical study and an experimental verification
Knowledge of the airflow distribution inside a Tunnel Boring Machine (TBM) can create a safe working environment for workers and machinery. The airflow quality and the related mass flow rate in the ventilation system should be sufficient to dilute gases and remove dust inside the tunnel. In this work, airflow distribution in the single shield TBM tunnel was studied using computational fluid dyn...
متن کاملthe reliability of a tunnel boring machine
greater levels of complexity in tunnelling with tunnel boring machine (tbm) allow higher chances of failures that may increase the potential hazardous risks. this paper presents the results of a study on tbm reliability using risk analysis. machinery failure mode and effect analysis was applied to analyze the risks of a tbm using qs9000 and sae.j1739 recommendations. for this purpose, 48 failur...
متن کاملTunnel boring machine positioning automation in tunnel construction
Purpose Tunnel construction using a tunnel boring machine (TBM) entails precise machine positioning and guidance in the underground space. In contrast to traditional laser-based machine guidance solutions, the proposed research aims to develop an automation alternative to facilitate TBMguidance and as-built tunnel alignment survey during tunnelling operations. Method A fully automated system is...
متن کاملGeological Hazards analysis in Urban Tunneling by EPB Machine (Case study: Tehran subway line 7 tunnel)
Technological progress in tunneling has led to modern and efficient tunneling methods in vast underground spaces even under inappropriate geological conditions. Identification and access to appropriate and sufficient geological hazard data are key elements to successful construction of underground structures. Choice of the method, excavation machine, and prediction of suitable solutions to over...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Applied Sciences
سال: 2020
ISSN: 2076-3417
DOI: 10.3390/app10113746